-
Environmental protection review report : Rabbit Lake Operations
As Canada’s nuclear regulator, the CNSC reviews the environmental protection measures put in place for every facility we regulate. The environmental protection review report... -
Regulatory Oversight Report for Canadian Nuclear Laboratories Sites: 2023
The regulatory oversight report describes the oversight activities by the CNSC and safety performance of Canadian Nuclear Laboratories sites in Canada in 2023. -
Darlington Relicensing - Information and Reports
This dataset includes links, documents, document titles and reports which are of importance to Ontario Power Generations (OPG)'s Darlington Relicensing Application. The purpose... -
Regional Information Monitoring Network for the Ottawa River Watershed...
Comments from public consultation on Phase I Report of the Regional Information Monitoring Network for the Ottawa River Watershed (RIMNet), held June 19 to July 21, 2025 -
What We Heard Report for DIS-24-02
The CNSC is revising REGDOC-2.13.2, Import and Export to align with the proposed amendments to the Nuclear Non-proliferation Import and Export Control Regulations. The aim of... -
Consultation background for REGDOC-1.3.1, Licence Application Guide: Uranium...
The following information is designed to help Canadians participate in our public consultation of February 19, 2024 to April 4, 2024. It provides an overview of all the... -
Sealed Source Tracking System
The accompanying dataset contains all transactions catalogued in the Sealed Source Tracking System with annual updates. The SSTS is used in conjunction with the National Sealed... -
Radionuclide Releases - Uranium Mines and Mills / Direct Discharge
This dataset contains the total annual releases of radionuclides released directly to the environment through direct discharge (i.e. releases to water) from uranium mines and... -
2019 Fees Report of the Canadian Nuclear Safety Commission
2019-20 Fees Report of the Canadian Nuclear Safety Commission -
Regulatory Oversight Report for Canadian Nuclear Laboratories Sites: 2022
The Regulatory Oversight Report for Canadian Nuclear Laboratories Sites: 2022 describes the safety performance of the sites that are licensed to Canadian Nuclear Laboratories... -
REGDOC 2.6.4, Chemistry Control for Reactor Facilities consultation feedback...
Comments received during feedback on comments period from July 15 to 28, 2025 -
Change Register for REGDOC-2.10.1, Nuclear Emergency Preparedness and...
Changes for version 2 to version 3 of REGDOC-2.10.1, for consultation held October 8, 2024, to April 22, 2025. -
DIS-24-04, Future Amendments the Nuclear Security Regulations: Granting...
The purpose of this paper is to outline the CNSC’s proposals to amend the Nuclear Security Regulations (NSR) to support the new authorities it will receive as a result of the... -
Radionuclide Releases - Nuclear Processing Facilities / Stack Emissions
This dataset contains the total annual releases of radionuclides released directly to the environment through stack emissions from uranium and nuclear substance processing... -
Comment Table for REGDOC-2.2.3 Vol. III Consultation
Comment Table for REGDOC-REGDOC-2.2.3, Personnel Certification, Volume III: Certification of Reactor Facility Workers, Version 2 -
DIS-24-03, Proposal to amend REGDOC-2.13.1, Safeguards and Nuclear Material...
The CNSC is revising REGDOC-2.13.1, Safeguards and Nuclear Material Accountancy to reflect the proposed amendments to the General Nuclear Safety and Control Regulations and to... -
DIS-14-01 Design Extension Conditions for Nuclear Power Plants
Following the 2011 disaster in Fukushima, Japan, nuclear regulators around the world launched a comprehensive review of their major nuclear facilities. For its part, the CNSC... -
Environmental protection review report : Cameco Fuel Manufacturing Inc.
As Canada’s nuclear regulator, the CNSC reviews the environmental protection measures put in place for every facility we regulate. The environmental protection review report... -
Comments from for REGDOC-1.1.4 Consultation
Comments from regulatory consultation for REGDOC-1.1.4, Licence Application Guide: Licence to Decommission a Reactor Facility - July 25, 2024 to October 25, 2024 -
Relevant References from the Administrative Monetary Penalty Issued to New...
The following is a list of references cited in the Notice of Violation issued to New Brunswick (NB) Power. The reference list includes correspondences sent between NB Power and...